MOURA PUMP STATION

BRS Electrical were engaged by Pensar to carry out electrical design and engineering for the new raw water pump station (RWPS) which feeds the Moura Water Treatment Plant (WTP), on behalf of the Banana Shire Council. The existing RWPS arrangement of 3 submersible pumps mounted on a floating pontoon secured to a jetty, which was […]
DRAWING SYSTEM AUDIT

With previous success at a number of BMA sites BRS was engaged by Blackwater Mine EEM to complete an audit of the current drawing system accuracy and compliance. As a result of the audit and GAP analysis work has now commenced to analyse the field electrical drawing and get the drawing library up to date […]
DRAWING SYSTEM IMPLEMENTATION AND SUPPORT

Initially, the goal was to complete ‘As-Built’ drawings for the Riverside Field Electrical Maintenance Department. The drawing management system has evolved to a system for continually maintaining a high level of accuracy and quality electrical drawings. BRS now provides administrative and technical assistance to the onsite document controller and electrical staff to maintain the electrical […]
DRAWING SYSTEM IMPLEMENTATION, MANAGEMENT AND SUPPORT

BRS have been exclusively responsible for maintaining the electrical drawing library for Peak Downs CHPP and Field Maintenance for over 20 years. Since January 2010 the prototype system developed at Gregory mine has been implemented with great success. Recently with the introduction of the Redeye database system. BRS has provided ongoing support to local electrical […]
CONTROL VOLTAGE UPGRADE

To come into line with the “Coal Mining Safety and Health Act 2001”, Part 4, Subdivision 2 –Electrical Control systems, Clause 26 (1), Peak downs CHPP has elected to upgrade the control voltage to 110VAC with EL protection in the MCC’s and 24VDC in the field I/O panels. At the same time the current I/O […]
DRAWING SYSTEM IMPLEMENTATION

What started as a need to ‘As-Built’ the current CHPP IO drawings, to enable SIGMA to implement a process control system upgrade has expanded into a full blown drawing management system for the site. BRS initially setup and managed the system for a number of years before handing it over to the site document controller […]