Drawing System Audit

Client
BHP Billiton Mitsubishi Alliance
Location
Blackwater Mine
Industry
With previous success at a number of BMA sites BRS was engaged by Blackwater Mine EEM to complete an audit of the current drawing system accuracy and compliance.
As a result of the audit and GAP analysis work has now commenced to analyse the field electrical drawing and get the drawing library up to date and compliant with the coal mining act.

BMA Blackwater Mine

BRS do everything well. They communicate well, work hard and work safely. And, we get continuity with who we work with, another reason which makes them our preferred vendor.
Josh Butler Electrical Engineering Manager, BMA Blackwater Mine
BRS Responsiblities
  • On site direction of point to point take offs of existing installation
  • Production of ‘As-Built’ drawings for these areas
  • Complete the architecture and implementation of the drawing management system.
  • Training and technical manuals for electrical staff and administrative staff.
  • Drafting services for creation of CAD versions of all drawings.
  • Providing work packs for as-built drawing investigations (point to point checks).
  • Overall responsibility for bringing the accuracy of drawing records up to an acceptable level.

Related Projects