When Does a Mining Project Need Electrical Drafting in Queensland?
Mining projects rarely run into trouble because someone forgot to draw a cable. Problems usually start when the drawings no longer match what’s installed. That

Mining projects rarely run into trouble because someone forgot to draw a cable. Problems usually start when the drawings no longer match what’s installed. That

Every industrial project has a point where the schedule either stays under control or starts slipping. It often comes down to the quality of the

BRS Electrical were engaged by BHP Billiton to relocate the existing CHPP offices and the LAB to a safer location out of the line of

Port of Brisbane engaged Pensar and a group of specialist consultants and contractors to complete major upgrade of the common user fuel

As November begins some of the team at BRS are beginning the journey of growing out their mo’s in support of the Movember cause in

BRS are pleased to have been awarded the Hazardous Area Classification for our new client The Country Chef Bakery. These reviews and classifications are in

BRS are pleased to have completed the earthing design and lighting protection study for Vertel’s Rubicon and Lanigan Hill communication facilities. For lightning risk management

BRS are pleased to have been awarded the contract for the engineering design services of adding low voltage infrastructure to the BMA Goonyella Riverside Mine’s

BRS are pleased to have been awarded the contract for Bravus’ Carmichael Mine to complete the electrical engineering design of a new LV/HV washdown facility.

That’s a wrap for 2017, folks. It’s been a big year for BRS Electrical – with some great projects completed and 10 year birthday celebrations.