BRS Electrical was contracted to work together with CommsPower to coomplete design and commission works for GrainCorp’s new Liquid Terminal at Port Kembla, NSW.
The project scope required us to complete an electrical design for the liquids site, including the programming and integration of PLC, Accuload systems and ancillaries (including boilers and waste water management). Stage 1 consisted of 12 tanks (10 for product, 1 for site diesel, 1 for slops liquids – including associated monitoring, pumps and valves) and 2 gantries; allowances had to be made for a future stage 2 upgrade of a further 6 tanks and 3rd gantry.