ARC FLASH STUDY

Client
HOLCIM
Location
Pakenham, Victoria

BRS Pty Ltd were engaged by Holcim to complete an arc flash study and protection coordination study for their Pakenham site. 

 The electrical network was modelled in SKM power tools, based on existing site single line diagrams.  BRS were able to provide the studies, as well as recommend changes to the existing protection settings.

BRS Responsiblities
  • Arc Flash Study
  • Protection Coordination Study

Related Projects