TEDDINGTON WATER TREATMENT PLANT UPGRADE 2024

BRS was engaged by Pensar to provide electrical design and drafting services for the upgrade of the dewatering switchboards and remote I/O panel at Teddington water treatment plant. The final design was used to support commissioning and final documentation. Project Manager – Jonathon Bott
HV SWITCHBOARD AND MOTOR UPGRADE

BRS was engaged by SEQWater to provide engineering and design services for end of life HV Switchboard and Motor replacements. The exiting switchboard was inspected by BRS and found to be unsuitable for refurbishment hence the design proceed with a full replacement. Water cooled HV motors were selected as replacements for the existing motors. Cooling […]
CALIX CALCINER MAIN SWITCHBOARD PACKAGE

BRS was engaged by Calix Pty Ltd to provide engineering and design services for a transportable Electrical Switchroom complete with all internal electrical equipment as required to power their 3.1MW Calciner package. Being a 5 year pilot plant the Client had a strong emphasis for low cost solutions and small footprint. BRS met these requirements […]
BMA 6.6kV CPP SWITCHBOARD UPGRADE

6.6kV DB Replacement Project-Successfully delivery during Shutdown
BRIBIE ISLAND STP MCC

BRS was engaged by Micaland to perform the electrical engineering and design services for the revamp of the T1 Transportable Mobile Crusher. BRS was employed to work with ‘Power-Lec Consulting’ to complete the For Tender design works and drawing package of the Bribie Island Sewage Treatment Plant main MCC Upgrade.The task to design a replacement […]
GANTRY DRILLING RIG

BRS Electrical were engaged by Herrenknecht Australia to carry out the electrical design and engineering for the control panel of the Westgate Tunnel Gantry Drilling Rig. BRS worked closely with Herrenknecht Australia Engineers to develop a tailored solution that would meet Herrenknecht Australia’s rigorous technical standards and precise workflow practices. The project challenges were overcome […]