BRS was engaged by Calix Pty Ltd to provide engineering and design services for a transportable Electrical Switchroom complete with all internal electrical equipment as required to power their 3.1MW Calciner package.
Being a 5 year pilot plant the Client had a strong emphasis for low cost solutions and small footprint. BRS met these requirements by providing a fit for purpose custom design solution whilst maintaining compliance to the necessary standards and regulations.
The switchroom was designed around a 40ft HC shipping container, with insulation and HVAC to remove over 30kW of heat load. BRS provided engineering and design for all equipment inside including a 3500A 415V MCC, 21 thyristor controllers and PLC cabinet to provide power and control for package.