LNQ SHUTE HARBOUR FUEL SYSTEM UPGRADE

BRS Electrical were engaged by Liquip North Queensland to carry out electrical design and engineering for the fuel system upgrade, part of the Shute Harbour Redevelopment Project.  Key elements of the Fuel System were the unloading and storage facilities, transfer pipelines and dispensing facilities.

BHP LAB RELOCATION

BRS Electrical were engaged by BHP Billiton to relocate the existing CHPP offices and the LAB to a safer location out of the line of fire as designated by the Old Tailings dam failure study.   BRS provided detail design and engineering for to enable relocation of the Lab, Office and amenities buildings.

SHOALWATER BAY SEWERAGE TREATMENT PLANT ASMTI FACILITIES – AUSTRALIA DEFENCE

BRS was employed as a Sub-Contractor to Pensar Water to complete the detailed electrical design for the new Sewerage Treatment Facility at Shoalwater Bay to service the new ASMTI facilities. BRS was responsible for the complete electrical engineering package including the electrical drawing and document packages, lightning risk assessment, control systems design, and commissioning of […]

HV SWITCHBOARD UPGRADE 2023-2024

  BRS were engaged by BMA to provide the electrical design and drafting for a new 6.6kV switchboard to replace the sites existing main switchboard at the coal processing plant that has reached its end of life.   BRS provided the engineering services to facilitate the design, integration, factory testing and changeover, whilst still maintaining […]

TEDDINGTON WATER TREATMENT PLANT UPGRADE 2024

BRS was engaged by Pensar to provide electrical design and drafting services for the upgrade of the dewatering switchboards and remote I/O panel at Teddington water treatment plant. The final design was used to support commissioning and final documentation.   Project Manager – Jonathon Bott