Moura Pump Station

Client
Paroo Council/Pensar
Location
Moura, QLD
BRS Electrical were engaged by Pensar to carry out electrical design and engineering for the new raw water pump station (RWPS) which feeds the Moura Water Treatment Plant (WTP), on behalf of the Banana Shire Council.
The existing RWPS arrangement of 3 submersible pumps mounted on a floating pontoon secured to a jetty, which was determined to be at risk of damage during flood events. The new pump station was designed to mitigate the risk of damage and potential loss of supply to the WTP.
BRS Responsiblities
  • Project Management
  • Detail Design and Engineering
  • Single line diagrams
  • Schematics
  • Termination diagrams
  • Equipment schedules
  • Cable sizing
  • Load flow study
  • Protection coordination study
  • Arc flash study

Related Projects