TEDDINGTON WATER TREATMENT PLANT UPGRADE 2024

BRS was engaged by Pensar to provide electrical design and drafting services for the upgrade of the dewatering switchboards and remote I/O panel at Teddington water treatment plant. The final design was used to support commissioning and final documentation.   Project Manager – Jonathon Bott    

HV SWITCHBOARD AND MOTOR UPGRADE

BRS was engaged by SEQWater to provide engineering and design services for end of life HV Switchboard and Motor replacements. The exiting switchboard was inspected by BRS and found to be unsuitable for refurbishment hence the design proceed with a full replacement. Water cooled HV motors were selected as replacements for the existing motors. Cooling […]

CALIX CALCINER MAIN SWITCHBOARD PACKAGE

BRS was engaged by Calix Pty Ltd to provide engineering and design services for a transportable Electrical Switchroom complete with all internal electrical equipment as required to power their 3.1MW Calciner package. Being a 5 year pilot plant the Client had a strong emphasis for low cost solutions and small footprint. BRS met these requirements […]