CQU MACKAY FAULT ANALYSIS

CQUniversity engaged BRS to complete a fault current calculation on Mackay City campus Building 1. The building was undergoing a renovation, with an imminent upgrade to the electrical LV distribution switchboards (and associated switch gear). Building 1 had undergone minimal electrical upgrades over its’ many decades of use. Both the MIMS main riser cable, many of the switchboards […]
PHARMA PROCESSING PLANT

A major pharma site has undergone a complete refit to suit the new synthesis process for their pharmaceuticals production. Our role grew from initially being engaged to complete the HA classification for the site to then using this detailed knowledge about the site to fulfill a coordination role for all HA compliance activities throughout the […]
DAM WALL RAISE

BRS was engaged as part of the civil consultant Engeny team, to deliver the GS1 tailings dam wall raise for Goonyella Riverside Mine. The tailings dam expansion require relocation of electrical infrastructure to suit the new dam heights.
ARC FLASH ANALYSIS

BRS was engaged by Micaland to perform the electrical engineering and design services for the revamp of the T1 Transportable Mobile Crusher. The T1 Crusher is a mobile and transportable coal crushing plant that allows mine sites to size or crush down mined coal so that it is suitable for processing in the washplant. The […]
NORTHPINE DAN MCC UPGRADE

BRS was employed as a Sub-Contractor to Comlek Group to design the replacement MCC for SEQW North Pine Dam – Dam Gates MCC, that had come to the end of its 40-year working life span. BRS was responsible for the complete electrical engineering package including An Arc Flash hazard analysis for the complete site. Significant […]
POWER SYSTEM MODELLING

BRS has an ongoing engagement with BMA Goonyella Riverside Mine to maintain the statutory power system model and associated drawings. As custodian for the Power Tools For Windows (PTW) model BRS regularly conducts project feasibility studies for Load Flow, Harmonic and Motor Starting Scenarios, using preliminary project data to update scenarios in the model and […]