NorthPine Dam MCC Upgrade

Client
Comlek /SEQwater
Location
Dam North Pine, QLD

BRS was employed as a Sub-Contractor to Comlek Group to design the replacement MCC for SEQW North Pine Dam – Dam Gates MCC, that had come to the end of its 40-year working life span. BRS was responsible for the complete electrical engineering package including An Arc Flash hazard analysis for the complete site.

Significant work was required auditing site infrastructure to ensure tie in points were understood and documented and that the new infrastructure would be easy to integrate to the brownfield site.

BRS Responsiblities
  • Electrical Engineering
  • Power system modelling and arc flash hazard assessment
  • Electrical Design Drafting
  • Site auditing of the existing electrical system