As part of the sites water management and with the wet season fast approaching, a series of automated valves were required to be installed around the dam gates and diversion channel. The valves are situated in a remote location with a solar and generator backed system to supply power to the infrastructure. BRS provided the solar power system design and the general electrical design for the sites. This included providing the interfacing for the telemetry unit which was then configured by others.