FUEL WHARF UPGRADES

Port of Brisbane engaged Pensar and a group of specialist consultants and contractors to complete major upgrade of the common user fuel bunkering wharf at Pinkenba. Works were staged over a number of major shutdowns to enable the operation for the wharf tenants to continue. BRS provide electrical and Hazardous area consultation and auditing throughout […]
GOLDEN CIRCLE HA CLASSIFICATION
HV SWITCHBOARD UPGRADE 2023-2024

BRS were engaged by BMA to provide the electrical design and drafting for a new 6.6kV switchboard to replace the sites existing main switchboard at the coal processing plant that has reached its end of life. BRS provided the engineering services to facilitate the design, integration, factory testing and changeover, whilst still maintaining […]
BMA 6.6kV CPP SWITCHBOARD UPGRADE

6.6kV DB Replacement Project-Successfully delivery during Shutdown
MOURA PUMP STATION

BRS Electrical were engaged by Pensar to carry out electrical design and engineering for the new raw water pump station (RWPS) which feeds the Moura Water Treatment Plant (WTP), on behalf of the Banana Shire Council. The existing RWPS arrangement of 3 submersible pumps mounted on a floating pontoon secured to a jetty, which was […]