WINE TURBINE TEST RIG
EAGLE FARM PUMP WELL
LNQ SHUTE HARBOUR FUEL SYSTEM UPGRADE

BRS Electrical were engaged by Liquip North Queensland to carry out electrical design and engineering for the fuel system upgrade, part of the Shute Harbour Redevelopment Project. Key elements of the Fuel System were the unloading and storage facilities, transfer pipelines and dispensing facilities.
BHP LAB RELOCATION

BRS Electrical were engaged by BHP Billiton to relocate the existing CHPP offices and the LAB to a safer location out of the line of fire as designated by the Old Tailings dam failure study. BRS provided detail design and engineering for to enable relocation of the Lab, Office and amenities buildings.
FUEL WHARF UPGRADES

Port of Brisbane engaged Pensar and a group of specialist consultants and contractors to complete major upgrade of the common user fuel bunkering wharf at Pinkenba. Works were staged over a number of major shutdowns to enable the operation for the wharf tenants to continue. BRS provide electrical and Hazardous area consultation and auditing throughout […]
GOLDEN CIRCLE HA CLASSIFICATION