BMA SWITCHBOARD INSPECTION AND SWITCHBOARD UPGRADE

BRS Electrical were engaged by BMA (BHP) to complete detailed inspections for LV switchboards at Saraji mine site.   BRS checked the overall design, highlighted non-compliances with BMA standards and verified the as-built drawings.     BRS inspections also covered the following:   Appropriate lockable doors and lockable main switches.  Correct use of Earth Leakage protection  Correct protection settings  Correct IP ratings, shroudings and segregation  Correct terminations  Water […]

NITROGEN GENERATOR PROJECT

BRS Electrical were engaged by BMA (BHP) to complete a detailed electrical design for the new Nitrogen Generator Project across multiple BMA sites.    The detailed electrical design involved the modification of existing switchboards and power distribution, as well as earthing systems and control systems.  

LNQ SHUTE HARBOUR FUEL SYSTEM UPGRADE

BRS Electrical were engaged by Liquip North Queensland to carry out electrical design and engineering for the fuel system upgrade, part of the Shute Harbour Redevelopment Project.  Key elements of the Fuel System were the unloading and storage facilities, transfer pipelines and dispensing facilities.

BHP LAB RELOCATION

BRS Electrical were engaged by BHP Billiton to relocate the existing CHPP offices and the LAB to a safer location out of the line of fire as designated by the Old Tailings dam failure study.   BRS provided detail design and engineering for to enable relocation of the Lab, Office and amenities buildings.