BRS were engaged by BMA to provide the electrical design and drafting for a new 6.6kV switchboard to replace the sites existing main switchboard at the coal processing plant that has reached its end of life.
BRS provided the engineering services to facilitate the design, integration, factory testing and changeover, whilst still maintaining power to critical 6.6kV plant areas. Design of the new switchboard included integration with existing services, site survey and identification of redundant services, and incorporation of future planned changes to 6.6kV power distribution network.
The final changeover works were completed within the scheduled plant shutdown timeframe. The total scope of the project spanned over 6500 manhours during the shutdown in addition to works completed from the office and factory.
The project was deemed by BMA to be highly successful, completed both ahead of schedule and under budget.
Service project covers – electrical engineering, drafting and site coordination and inspection and site commissioning works.
Testimonial Message
| Just wanted to do a big shoutout to everyone involved in the GRM CPP2 6.6kV DB Replacement Project.
The project was to replace the main 6.6kV distribution board which is the main “heart” for the Riverside Area / CPP2. The team worked together tirelessly leading up to the shutdown, working with ABB, GB Industries, Hahnlec, BRS Electrical and the GRM shift electricians. The planning required for this project to be executed in the short shutdown window was nothing less than impressive, and I am proud to say that Subra, Ivan, Chris, Marcus, Ryan, Chris (BRS Electrical), Raj and company (ABB) and all others involved executed the project to perfection. These types of projects highlight the great work that can be achieved by our skilled Engineering team. |