BHP LAB RELOCATION

Client
BHP
Location
BHP South Walker Creek, QLD, Aus
Industry
BRS Electrical were engaged by BHP Billiton to relocate the existing CHPP offices and the LAB to a safer location out of the line of fire as designated by the Old Tailings dam failure study.

 

BRS provided detail design and engineering for to enable relocation of the Lab, Office and amenities buildings.

BRS Responsiblities

Project Management

Detailed Design and Engineering

Single Line Diagrams

Schematic Diagrams

Switch Board General Arrangements

Material Take off/BOM

Electrical Cable Schedule

Maximum Demand Calculations

Load Flow Caluations

Short Circuit Study

Protection coordination study

Arc Flash Study

Related Projects