BRS Electrical were engaged by BMA (BHP) to complete detailed inspections for LV switchboards at Saraji mine site.
BRS checked the overall design, highlighted non-compliances with BMA standards and verified the as-built drawings.
BRS inspections also covered the following:
- Appropriate lockable doors and lockable main switches.
- Correct use of Earth Leakage protection
- Correct protection settings
- Correct IP ratings, shroudings and segregation
- Correct terminations
- Water leaks, rusting, and other environmental issues.