DOUGLAS WATER TREATMENT PLANT

DOUGLAS WATER TREATMENT PLANT

BRS was employed as a Sub-Contractor to MPA Engineering to complete the detailed electrical design for the replacement of clarifier modules 3 & 4 at the Douglas Water Treatment Plant , that had come to the end of its working life span. BRS was responsible for the complete electrical engineering package including site investigation and […]

TEDDINGTON WATER TREATMENT PLANT UPGRADE 2024

TEDDINGTON WATER TREATMENT PLANT UPGRADE 2024

BRS was engaged by Pensar to provide electrical design and drafting services for the upgrade of the dewatering switchboards and remote I/O panel at Teddington water treatment plant. The final design was used to support commissioning and final documentation.   Project Manager – Jonathon Bott    

NORTHPINE DAN MCC UPGRADE

BRS was employed as a Sub-Contractor to Comlek Group to design the replacement MCC for SEQW North Pine Dam – Dam Gates MCC, that had come to the end of its 40-year working life span. BRS was responsible for the complete electrical engineering package including An Arc Flash hazard analysis for the complete site. Significant […]

BRIBIE ISLAND STP MCC

BRS was engaged by Micaland to perform the electrical engineering and design services for the revamp of the T1 Transportable Mobile Crusher. BRS was employed to work with ‘Power-Lec Consulting’ to complete the For Tender design works and drawing package of the Bribie Island Sewage Treatment Plant main MCC Upgrade.The task to design a replacement […]