RIPSTONE DAM

Ripstone Dam was identified as the highest priority dam for supplying storage capacity to dewater the 2 South Wattle pit. This required getting water from Ripstone Dam to the 2 South Wattle pit. An electric pump was needed to complete this task, so BRS were engaged to undertake the design. BRS completed the electrical design […]

SERVICE CENTRE SOUTHPORT

An old existing service station complex in Southport Queensland was to be removed and a new modern service centre including a fast food outlet developed on the site. BRS was engaged by Cadway Projects to design electrical systems for the facility. Duy was entrusted with the design task while Scott worked on the project management […]

LNG WELLHEAD SEPARATOR SKIDS

Santos GLNG project required an integrated separator skid to continue their planned expansion throughout the Surat Basin. As Lead E&I engineer for the fabricator Hitec Welding, BRS successfully managed the complete design and installation of the electrical and instrumentation system for the integrated separator skid. As well as coordinating several vendors, both locally and internationally, […]

FUEL TERMINAL UPGRADE

BRS Electrical, contracted to and working together with CommsPower, completed design and commissioning works for GrainCorp’s upgraded Liquid Terminal at the Port of Fremantle, WA. The system was to monitor tank levels, and provide pumping application for both Caustic and Solvesso liquids – the former via an overhead loading truck gantry. Due to hazardous nature […]

RADIAL STACKER CONVEYOR

This project involved the replacement of the radial stacking conveyor at the CHPP. Increased throughput to 2800 T/Hr effectively removing a bottleneck within the plant. The project goals included creating a design to latest standards, with efficiency of operation and maintenance being critical.

FIXED CRUSHING PLANT

As part of the Fairfield Quarry expansion, a fixed crushing plant was proposed and implemented by BRS. This upgrade was implemented to increase plant runtime and decrease downtime on repairs and maintenance. Clermont Bulk Handling P/L. Mike went to a lot of effort to sort out our plant. Went the extra step to sort out […]