NITROGEN GENERATOR PROJECT

BRS Electrical were engaged by BMA (BHP) to complete a detailed electrical design for the new Nitrogen Generator Project across multiple BMA sites.    The detailed electrical design involved the modification of existing switchboards and power distribution, as well as earthing systems and control systems.  

STACKER REPLACEMENT POWER STUDY

BRS Pty Ltd were engaged by Takraf to complete various studies for the Radial Stacker CC7M replacement project, part of the BMA Goonyella Riverside Mine CHPP1.   The new stacker consisted of a 415V 220kW Conveyor, 150kW Jet Slinger Drive and auxiliaries fed from a new MCC. The new MCC was integrated into the existing […]

QUU EAGLE FARM PUMP WELL

  BRS Electrical were engaged by ABB, to work in conjunction with QUU control engineers, to complete a detailed design of the integration works for replacement 2MW motors at QUU’s eagle farm pump well. The detailed electrical design involved creating updated electrical schematics, a redesign of the MCC/RTU enclosure. A complete Bill of Materials take […]

DOUGLAS WATER TREATMENT PLANT

BRS was employed as a Sub-Contractor to MPA Engineering to complete the detailed electrical design for the replacement of clarifier modules 3 & 4 at the Douglas Water Treatment Plant , that had come to the end of its working life span. BRS was responsible for the complete electrical engineering package including site investigation and […]