Liquids facility
Hansons hobart quarry
Boonal Train Loadout
BRS Electrical was awarded the Contract to upgrade the PLC Control Systems at the Boonal Train Loadout Facility, Bluff, in Central QLD. The project scope required BRS to complete and update the sites Electrical Schematics & Drawings, PLC programming, installing and integration of a new Allen Bradley CompactLogix PLC & PanelView Plus 1500 Touch Screen. […]
Graincorp Fuel Terminal
As part of Graincorps’ expansion of its’ bulk liquid facilities, BRS Electrical was contracted in conjunction with CommsPower to complete electrical design for a new tank farm and upgrades to an existing fuel terminal at Pinkenba. The system had to monitor tank levels, flow rates, requests for product and transfer product between the ship berth, […]
Heyford Pit Pumping
The mine site required stored mine affected water within the Heyford Pit to be transported to other locations on site to enable coal production from this pit. This project comprised of 4 LV pumping stations at various locations across the site to facilitate the creation of a water transfer network. BRS was responsible for electrical […]
Yarrabee ROM
BRS Electrical was engaged to provide electrical design work for a new Raw Coal Conveyor to feed into the Yarrabee Washplant, covering the conveyor, local sump pumps, area lighting and allowance for future expansion. In order for the conveyor to be integrated into the existing site Washplant and processing systems, PLC automation was implemented across […]