SCHMIDT QUARRIES PLC/HMI DESIGN

SCHMIDT QUARRIES PLC/HMI DESIGN

BRS Electrical were engaged by Schmidt Quarries to complete PLC and HMI software development, FAT testing and site commissioning at their Bench 1 Fixed plant.  BRS also carried out arc flash analysis, short circuit study and protection coordination for the plant.  As part of the final handover, BRS submitted a detailed Operators Interface Manual describing the operation of the SCADA interface.   

Shoalwater Bay Sewerage Treatment Plant ASMTI Facilities

: Shoalwater Bay Sewerage Treatment Plant ASMTI Facilities - Australian Defence

BRS was employed as a Sub-Contractor to Pensar Water to complete the detailed electrical design for the new Sewerage Treatment Facility at Shoalwater Bay to service the new ASMTI facilities. BRS was responsible for the complete electrical engineering package including the electrical drawing and document packages, lightning risk assessment, control systems design, and commissioning of […]

HANSONS HOBART QUARRY

Hitech Hobart quarry engaged BRS Electrical to undertake  the supply, installation and commissioning of various electrical components as part of an upgrade at their existing quarry in Flagstaff Gully. The upgrade was to install a modular primary crushing unit close to the quarry extension pit, then convey the primary crushed material to a new surge […]

CUNNAMULLA STP UPGRADE

BRS Electrical were engaged by Pensar to carry out electrical design and engineering for the Cunnamulla STP Upgrade Project. The existing STP was originally constructed in the 1930’s and upgraded in the 1970’s to double the plant’s capacity. A recent review identified the that many of the plant components had reached the end of their […]

BOONAL TRAIN LOADOUT

BRS Electrical was awarded the Contract to upgrade the PLC Control Systems at the Boonal Train Loadout Facility, Bluff, in Central QLD. The project scope required BRS to complete and update the sites Electrical Schematics & Drawings, PLC programming, installing and integration of a new Allen Bradley CompactLogix PLC & PanelView Plus 1500 Touch Screen. […]

Yarrabee ROM Coal Conveyor Electrical Project

BRS Electrical was engaged to provide electrical design work for a new Raw Coal Conveyor to feed into the Yarrabee Washplant, covering the conveyor, local sump pumps, area lighting and allowance for future expansion. In order for the conveyor to be integrated into the existing site Washplant and processing systems, PLC automation was implemented across […]