Cunnamulla STP Upgrade

BRS Electrical were engaged by Pensar to carry out electrical design and engineering for the Cunnamulla STP Upgrade Project.

The existing STP was originally constructed in the 1930’s and upgraded in the 1970’s to double the plant’s capacity. A recent review identified the that many of the plant components had reached the end of their useful service life, and that the existing plant no longer meets its expectations and is at risk of failure.

BRS Responsibilities

  • Project Management
  • Detail Design and Engineering
  • Single line diagrams
  • Schematics
  • Equipment schedules
  • Earthing design
  • Switchboard Gas
  • PLC and SCADA coding
  • Onsite commissioning support
  • Operator training for the SCADA control system
  • 12-month operation support