ARC FLASH STUDY

Holcim logo

BRS Pty Ltd were engaged by Holcim to complete an arc flash study and protection coordination study for their Pakenham site.   The electrical network was modelled in SKM power tools, based on existing site single line diagrams.  BRS were able to provide the studies, as well as recommend changes to the existing protection settings.

CAVILL RIDGE MINE DRAGLINE

CAVILL RIDGE MINE DRAGLINE

BRS are pleased to have been awarded the arc flash study for BMA’s Caval Ridge Mine dragline. The purpose of this study is to assess the arc flash PPE rating of the amin HV and LV switchboards and provide solutions for mitigating the risk associated with regular maintenance and use in dusty and constrained environments.

STACKER REPLACEMENT POWER STUDY

STACKER REPLACEMENT POWER STUDY

BRS Pty Ltd were engaged by Takraf to complete various studies for the Radial Stacker CC7M replacement project, part of the BMA Goonyella Riverside Mine CHPP1.   The new stacker consisted of a 415V 220kW Conveyor, 150kW Jet Slinger Drive and auxiliaries fed from a new MCC. The new MCC was integrated into the existing […]

HTC PROCRUSH ARC FLASH STUDY

HTC Procrush Arc Flash Study

BRS Pty Ltd were engaged by Hitech to complete various power studies for their Procrush Quarry operations. Power systems studies are required quite frequently from various clients whenever new equipment is needed or an electrical review is requested.      BRS successfully carried out the following studies using SKM PTW software:  Load flow  Arc Flash  Protection Coordination     

ARC FLASH ANALYSIS

BRS was engaged by Micaland to perform the electrical engineering and design services for the revamp of the T1 Transportable Mobile Crusher. The T1 Crusher is a mobile and transportable coal crushing plant that allows mine sites to size or crush down mined coal so that it is suitable for processing in the washplant. The […]