QUU EAGLE FARM PUMP WELL

Client
ABB/QUU
Location
Eagle Farm

 

BRS Electrical were engaged by ABB, to work in conjunction with QUU control engineers, to complete a detailed design of the integration works for replacement 2MW motors at QUU’s eagle farm pump well.

The detailed electrical design involved creating updated electrical schematics, a redesign of the MCC/RTU enclosure. A complete Bill of Materials take off list.

Works were completed and commissioned by ABB for this critical network infrastructure.

BRS Responsiblities

BRS Responsibilities:

  • Electrical Engineering
  • Electrical Drafting
  • Switchboard design
  • Inspect and Commissioning

Related Projects