As part of the mine’s expansion and overhaul, the coal crushing plant including complete control system overhaul was completed in 2005. This upgrade also included the installation of an additional skyline conveyor and direct feed to the new CHPP.
- Design Commissioning, Electrical Drafting, Electrical Engineering, Site Commissioning Works, Switchboard Design