LNQ SHUTE HARBOUR FUEL SYSTEM UPGRADE

BRS Electrical were engaged by Liquip North Queensland to carry out electrical design and engineering for the fuel system upgrade, part of the Shute Harbour Redevelopment Project.  Key elements of the Fuel System were the unloading and storage facilities, transfer pipelines and dispensing facilities.

SEWERAGE TREATMENT PLANT

Mackay Regional Council (MRC), as part of planned upgrades to the Mirani Treatment Facility, engaged Thomas and Coffey to construct a Preliminary Treatment Facility with air treatment processing for odour control in the sewerage processing plant. The project had a tight deadline and the client (Thomas and Coffey) needed a quick response to HA queries to […]

AVIATION FUEL TANK

BRS were initially engaged by IOR to complete the HA classification of the prefabricated low profile aviation fuel tank. When this was combined with a high flow dispensing unit and setup for site use at the Westpac Helicopters bases at Caloundra and Carrara, BRS expanded the scope of the classification to cover the final site […]

ALKALOIDS EEHA COMPLIANCE

BRS was engaged by Micaland to perform the electrical engineering and design services for the revamp of the T1 Transportable Mobile Crusher. The T1 Crusher is a mobile and transportable coal crushing plant that allows mine sites to size or crush down mined coal so that it is suitable for processing in the washplant. The […]

PAINT PLANT HA WORKS

BRS was engaged by Bluescope to provide an EEHA compliance audit of the painting facility at their steel processing facility in Brisbane. The works consisted of a review of the HA dossier and associated documentation. Out of this review came recommendation for rectification works as well as an update of the HA classification.