MIA FUEL FACILITIES

A new facility was created to provide lube oil storage and distribution for service bay and workshop areas at the new mine main industrial area (MIA). The project also included a heavy vehicle and light vehicle refueling facility. Each bay included a remote IO drop networked back to the main PLC panel. Liquip Sales NQ […]
DISC FILTER NO 1 REPLACEMENT

As part of plans to increase the Peak Downs Mine CHPP, new Denver disc filters were procured from Bokela. The new filters replace similar existing filters, with the aim to improve the process throughout and recovery rates. This project covered the replacement of just the first unit with a further 2 filters to be completed […]
COAL PROCESSING PLANT AND RAIL LOAD OUT FACILITY

As part of the construction of the new mine just south of Emerald, the processing plant and rail load out facilities were designed and developed to meet the output of this new mining development. Sojitz Minerva Mining P/L BRS live up to the service they say they will provide, and that is why we don’t […]
ETHANOL FROM GRAIN PLANT

This project involved the installation of a new 76Mill Ltr/year grain to ethanol refinery based on Delta T process plant and redesigned for Australian standards and compliance to local regulations.
MARINE LOADING ARM AND PIG RECEIVING STATION

Neumann petroleum added a new marine loading arm and dedicated wharf line back to their eagle farm terminal, mechanical and process design by TFA Project Group . This included a pigging system to enable line clearance and segregation of products. The wharf installation included the loading arm with manual controlled stripping pump and pig launching […]