BHP LAB RELOCATION

BRS Electrical were engaged by BHP Billiton to relocate the existing CHPP offices and the LAB to a safer location out of the line of fire as designated by the Old Tailings dam failure study.

 

BRS provided detail design and engineering for to enable relocation of the Lab, Office and amenities buildings.

Related Articles